Our major building site in Brandenburg - finished

 

In the past we presented on those pages the progresse of construction at our major building site in Brandenburg. 

 

Developer was  Classen Industries GmbH. This construction is now finished.  

 

Seven new halls had been built with a total area of 35.000 m2. The following material was used in building:

 

  • 2.200 tons of steel with spans of up to 60 meters as frame construction

  • 9.000 m2 gas-concrete fire walls with ferro-concrete construction

  • 77.000 m2 thermal walls

  • 25 selection gates

  • 15 fire prevention gates

  • 1270 running meters light bonds with RWA shutters

  • 35.000 m2 roof trapeze metal sheets

  • 35.000 m2 with A1 insulation

 
 
 

By clicking on the plans separated areas you still can watch the past progresses of the construction. But now you can follow up the progresse from the beginning to the completion. 

 

At this point we want to show you some impressions of the building. The pictures were made after the completion. They show the factory building after the offical opening and putting into operation at 12th July 2002. 

Click here for the impressions

 

 seen enough